This $20 million LEED Silver Project created a new Department of Motor Vehicles facility with inspection lanes to replace the existing facility. The new facility features a seven (7) bay inspection lane, four (4) drive-through teller windows and thirty (30) customer counter spots. The main public areas include customer service, public reception and customer workstations. Supply air is distributed to the space via a fabric duct that is exposed in the high ceiling. The motor vehicle inspection station utilizes an under floor radiant heating system that is intended to maintain a 70 degree slab temperature when the outdoor air temperature is below 55 degrees.